|
Camp Ellis, IL

Under a performance-based contract (PBC), performed MEC design and removal actions (mag and dig) of more than 40 acres and geophysical investigation of 305 acres. Use of a prototype towed-array digital geophysical mapping system resulted in 66% faster data collection along with increased quality control. |
|